Letchworth bridge construction underway
-
- November
- 21
A long-awaited bridge-replacement project at the former Letchworth Village finally started this week.
The bridge on American Legion Way, formerly known as Underpass Road, was condemned in fall 2005 because of structural problems.
The condemnation left the North Rockland school district’s Fieldstone Secondary School and Willow Grove Middle School without an emergency route in or out of the facilities. Employees of the Hudson Valley DDSO, a local division of the state Office of Mental Retardation and Developmental Disabilities located at Letchworth, were trapped in the area when its primary access road for was blocked by storm damage.
I’ll check with the town about the progress of the construction.
This entry was posted
on Wednesday, November 21st, 2007 at 7:48 pm by Akiko Matsuda.
You can follow any responses to this entry through the RSS 2.0 feed.
Share and Enjoy: del.icio.us Digg Google Technorati Yahoo! |
Print
|
Email
Leave a Reply
It is a condition of your use of the comment features associated with the blogs that you do not: Use the site to post or transmit any unlawful, threatening, abusive, libelous, defamatory, obscene, vulgar, pornographic, profane or indecent information of any kind, including without limitation any transmissions constituting or encouraging conduct that would constitute a criminal offense, give rise to civil liability or otherwise violate any local, state, national or international law. You alone are responsible for the material you post or send. Refer to the
Terms of Service.